The Process

Six steps.
Zero surprises.

From the moment you drop your zip to the day your panels are producing — six discrete, defined steps. Alex personally reviews every intake and quote.

  • Founder-reviewed
  • Satellite-mapped site visit
  • Permits we pull
  • PTO we chase

Six steps

From zip code
to permission-to-operate.

  1. 01

    Drop your zip

    Online, phone, or text. Alex personally reviews every intake — no call center. Hot leads receive a quote within 30 minutes during business hours.

  2. 02

    Site visit

    45-minute walkthrough using satellite-based mapping software — roof orientation, panel scope, electrical run. No drone required.

  3. 03

    Custom design

    System layout + production estimate + financing options + all applicable incentives modeled, side-by-side.

  4. 04

    Permits + interconnect

    We pull permits, file interconnection, handle the engineering stamps. Town of Hempstead and Oyster Bay typically under 60 days.

  5. 05

    Install

    One day on the roof for most systems. Bundle projects run roof day one, solar day two. Electrical panel upgrades may extend the schedule if utility involvement is needed.

  6. 06

    PTO + monitoring

    Final inspection, utility PTO, production monitoring via Enphase Enlighten or Tesla app — on your phone the same day.

EnergiSense crew installing residential solar

Why we do it this way

“Six steps means six placeswe can't hide a corner cut.”

Alex Lubin

·

Founder · Operating since 2021

Behind the process

The credentials
behind the steps.

GAF

Master Elite

Top 2% of contractors nationwide

NABCEP

Certified

PVIP · PV Installer · PV Designer

$0

Down

Standard financing, 650+ credit (good credit required)

Process FAQ

The timing & sequence
questions.

How long until panels are producing?

Typical timeline from signed agreement to permission-to-operate is 6–10 weeks. Bottleneck is utility interconnection (PSEG / Con Edison), not us. We file early and chase weekly.

Will my roof need to be replaced first?

If your shingles have 5+ years left, panels go up directly. If not, we replace the roof first — usually with the GAF HDZ — and bundle the labor so you only pay the differential. For flat roofs, we need 10+ years of roof life remaining.

What incentives stack in New York?

Residential incentives now need to be verified by install date, utility, property type, and tax eligibility. EnergiSense models applicable New York credits, utility net-metering rules, and any borough-specific programs on your proposal before you sign.

What happens if a panel fails?

25-year production warranty (92% at year 25), 12-year product warranty, 12-year inverter warranty, 10-year workmanship warranty. Alex is a phone call or text away if anything goes wrong.

Step 01 starts here

Drop your zip.
Alex takes step 02.

No call center. No data resale. Real human responds. Alex personally reviews every intake — quote in 24 hours.

Lock my founder rate

Drop your zip. 60 seconds.

3 steps · 60 seconds · No spam